• HOME
  • CONTACT
  • DONATE
  • PHOTO GALLERY
  • SCHEDULE
  • STUDENT/PARENT INFO
  • HOME
  • CONTACT
  • DONATE
  • PHOTO GALLERY
  • SCHEDULE
  • STUDENT/PARENT INFO

Building – Fall 2017

October 22, 2017 Building a Vans RV-12 No Comments

The Teenflight Campbell River crew started up again with the beginning of the new school year. When the summer ended, the firewall and center wing spar box was being assembled. Since then more bulkheads have been completed and the longerons have been bent. The Longerons run along the length of the fuselage on each side and give the aircraft strength.

 

The Centre Section is coming together

Trimming one side of the Baggage Bulkhead to fit the Longeron

Sideskins are primed and ready to be added

 

Work on the Upper Firewall that will eventually hold the Engine Cowl

 

Sideskins are temporarily attached and match drilled before being riveted to the bulkheads and longerons

 

 

Wings & Wheels Picture Gallery

Fuselage and Wing Progress

Leave a Reply

Like and Follow Us on Facebook

Recent Posts

  • New Student Applications
  • 7th Annual Wings ‘n’ Wheels
  • Welcome New Students!
  • Wings ‘n’ Wheels 2019
  • September 2018 Building

Categories

  • Building a Vans RV-12
  • Special Events
  • Tours and Field Trips
Weather Icon
TeenFlight Campbell River is a Registered Charity / Business No. 832441380RR0001
Proudly powered by WordPress | Theme: Doo by ThemeVS.